Industrial Design
From 2014 to presentAce Bakery - 3 Way shoppable
December 2021 - The Central GroupI created a dynamic 3-way shoppable unit for Ace Bakery, blending metal and wire shelves, a double-sided header and a mobile design (18” x 18” x 60”). My role was to present multiple concepts to the client, refine the chosen one, and finally translate it into precise engineering drawings. The result is an innovative, visually appealing and functional display solution that enhances the overall retail experience for Ace Bakery and its customers.
Check out the case studySoftware: Solidworks, Illustrator
Timeline: Entire project 8 months, Just the fixture 6 weeks
My Role: Design, Present, Engineer, Render, Final Product Quality Control
GLab Touch and Learn
September 2023 - The Central GroupThe GLab Touch and Learn project aimed to create a unique display unit for peg board walls on Walmart Shelves, showcasing the latest GLab razors for customer interaction. I designed with focus on both strength and safety, the challenge was to prevent customer interference while ensuring secure shipping. It was critical to be mindful of cost. The unit combined durable metal for structural strength and styrene for graphics, providing a visually engaging and secure solution. The innovative signed allowed customers to touch and experience the newest razors, which featured a swirling capability, enhancing the overall retail engagement.
Software: Solidworks
Timeline: 6 months
My Role: Design, Engineer, Render
Starbucks On the Go
January 2018 - Array MarketingThe scope of this project was to design a Self-Serve on-the-go Kiosk that offers premium espresso and requires minimal operational effort.
Check out this project on Starbucks websiteSoftware: Solidworks, Illustrator
Timeline: 3 months
My Role: Research, Design, Present, Material Sample Test, Render
Fragrance Table
February 2020 - Array MarketingThe goal of this project was to design a fragrance table for new arrivals. During this project, I tried to implement the brand's identity into the design by using solid and high-end looking materials such as glass and marble.
See more pictures of the entire projectSoftware: Solidworks, Illustrator
Timeline: (entire project 4 months) just the fixture 3 weeks
My Role: Research, Design, Present, Material sample test, Render
Mini Cart
January 2020 - Array MarketingThis project was part of a larger project where the client requested to design the entire store. We were a group of 4 designers who worked on different fixtures of the store. I designed a mini-cart that contains travel-sized cosmetic and toiletry products.
See more pictures of the entire projectSoftware: Solidworks, Illustrator
Timeline: (entire project 4 months) just the fixture 3 weeks
My Role: Research, Design, Present, Render
MAC Makeup Unit and Play Table
September 2015 - Interior manufacturing group Inc. (IMG)The client asked our team to update their existing complex unit that contains a makeup unit, a color wall and a play table. I developed the makeup unit and added more functionality to it.
Software: Solidworks
Timeline: 4 months
My Role: Develop, Draft
Shoppers Drug Mart Beauty Boutique
January 2015 - Interior manufacturing group Inc. (IMG)I developed an existing design of a free-standing unit that was meant to act as both display and an addition to another unit. The complex shapes and decorative elements were the main challenge of this project.
Software: Solidworks
Timeline: 2 months
My Role: Develop, Draft
Atomic Display
November 2019 - Array MarketingThe client requested a design of a countertop display which showcases their brand new product.
Software: Solidworks
Timeline: 3 weeks
My Role: Design, Present
Guardamate | High-end Security
September 2020 - Tellext Industrial AutomationThis project was about building a mobile security robot to enhance crime deterrence and the overall safety of premises through mobile patrolling, advanced observation, automated reporting, and real-time response. My role was to conduct research on the required components and sketch ideas on how to place them with an industrial and rugged-looking exterior.
Check out the final projectSoftware: Solidworks
Timeline: 2 months
My Role: Research, Design, Render